Manufacturing consulting and productivity improvement
Cut manufacturing costs by up to 30%. Raise output by up to 40%.
For managing directors, plant heads and operations leaders. Hands-on consultants who work on your shop floor to lower manufacturing cost, remove bottlenecks and unlock hidden plant capacity without expensive CapEx.
Practical manufacturing consulting in India, Africa and the Middle East, from single plants to Fortune 500 groups.
- Boots-on-the-ground implementationOur specialists work alongside your supervisors and operators, not through slide presentations.
- Hidden capacity, unlocked20% to 40% higher throughput from the plant you already have, before you spend on new machinery.
- First savings in 6–8 weeks; payback typically in 3–6 months.Measurable reductions in scrap, cycle time, WIP inventory and unplanned breakdowns.
- 10,000+
- Successful projects and workshops
- 400+
- Clients
- 15+
- Countries served
- 50+
- Industries covered
- 50,000+
- People trained
Trusted by manufacturing leaders across India and globally
Where manufacturing cost hides on your shop floor
It is invisible on the monthly P&L, but you can see it on your production lines, in your inventory and at every machine changeover.
30%
Labor and line productivity lost
Material criss-crossing the shop floor, unbalanced lines and operators waiting, all pushing up the cost of every unit.
4x
Excess capital locked in inventory
Piles of raw material, work in progress and finished goods tying up working capital and valuable floor space. Pull-based flow releases that cash.
₹5–50 Cr
Premature, avoidable CapEx
New equipment bought or extra warehouses rented while existing assets run with 35%+ unrecovered downtime.
45%
Spike in downtime and scrap
Slow die changeovers, recurring stoppages and avoidable rework eat into margins. Plants that reduce factory downtime protect both margin and dispatch dates.
Find out where your plant is losing the most.
Book your free 45-minute plant diagnostic callEstimate how much you could reduce production cost
Move the sliders to match your plant and see the approximate annual savings from cost control and cost reduction on your shop floor.
₹5 Cr₹250 Cr
2 hours40 hours
1%15%
Estimated recoverable annual profit
₹0.7 Cr – ₹1.3 Cr
- ₹0.7 Cr
- Quick wins in phase 1
- ₹1.3 Cr
- Full transformation
Based on standard manufacturing benchmarks: direct operating cost at 65% of turnover, a 3.5% base lean saving, plus downtime and scrap recovery.
Book your free 45-minute plant diagnostic callAn indicative range, not a quotation.
Real factories. Real numbers. Measurable financial impact.
The true test of manufacturing productivity improvement is what your factory can measure on the balance sheet: first savings in 6–8 weeks, payback typically in 3–6 months.
+40%
Production output
India’s largest cryogenic equipment manufacturer
What we didCellular plant layout, line balancing and a time and motion study.
−39%
Inventory holding cost
Global automotive wire harness and components maker
What we didValue stream mapping, Kanban pull across the supply chain, and standardized work.
−45%
Machine breakdowns
Leading biotechnology and formulations plant
What we didTotal Productive Maintenance, OEE improvement and rapid changeovers.
Manufacturing optimization for the bottlenecks that cost you most
We pick the lean methods that fit your plant, then put them in place with your team on the line.
Bottleneck removal and value stream mapping
Map your order-to-dispatch value chain, find where material gets stuck and use pull-based flow to cut production lead times by 25% to 45%.
35% shorter delivery lead times
Rapid setups and changeovers (SMED)
Cut die and tooling changeover times by 50%+, so smaller batches, faster product changes and higher machine availability become practical.
50%+ less changeover idle time
Workforce productivity and line balancing
Time and motion studies remove non-value-added motion and balance assembly stations to raise labor output.
25–35% higher manpower output
Zero-breakdown maintenance (TPM and OEE)
Eliminate chronic breakdowns and micro-stoppages, reduce factory downtime and steadily improve overall equipment effectiveness.
Up to 45% fewer machine breakdowns
Shop-floor organization and 5S discipline
Turn cluttered floors into visually managed work areas where tools and parts are found in seconds.
20–40% factory floor space saved
Lean Six Sigma and scrap reduction
Root-cause problem solving and tighter process control reduce scrap rate in manufacturing, along with costly rework and customer returns.
Up to 60% less scrap and rework
The four-phase transformation roadmap
Structured, low-risk manufacturing optimization that moves your plant from first diagnosis to self-sustaining operational excellence.
Phase 1Diagnose
An on-site shop-floor audit. We find the material flow bottlenecks and sources of waste, and calculate the savings in rupees.
Phase 2Design
An improvement blueprint built around your product mix, plant layout and growth plans, tied to clear financial KPIs.
Phase 3Implement
Boots-on-the-ground execution. Our lean implementation consultants work shoulder to shoulder with you and your team of supervisors, engineers and line operators.
Phase 4Sustain
Standard operating procedures, daily work management and internal champions trained in lean and productivity methods, so the improvements become permanent.
Want to know what your plant could save?
Book your free 45-minute plant diagnostic callWhat manufacturing leaders say about working with us
44% manpower productivity
“While we already knew what needed to be improved, they introduced and implemented the right methods, resulting in a 44% improvement in manpower productivity.”

42% productivity
“Faber has been a partner in the transformation journey, delivering a phenomenal 42% productivity improvement.”

33% production
“We can see the difference of 33% production improvement and we are very happy working with team Faber. They have always worked as being a part of Umasree Texplast.”

20% more production
“We implemented the Performance Management System with Faber Infinite at Waterman Industries. As a result, we increased our production by 20%, space-saving by more than 50%, reworking has been reduced by 23%…”

32% manpower productivity
“Faber has been greatly responsible for starting the drive of transformation… Team Faber has helped us improve manpower productivity by ~32%, reduce shop floor WIP by ~10%, reduce overall throughput time and many more.”

1–3 of 5
Why Faber Infinite
Lean implementation consultants in India
We call ourselves implementers, not boardroom consultants. Every engagement is run by a senior productivity improvement consultant and a team that stays with you from the first workshop to rollout.
- Client engagement advisor
- 30+ years of experience
- Business head
- ~20 years of experience
- Client engagement manager
- 10+ years of experience
They lead manufacturing productivity improvement with your steering committee and execution team, backed by our delivery team, quality assurance, our business alliances and a body of knowledge from 400+ clients across consulting, operational improvement and training.
Offices in India
Ahmedabad · Pune · Vadodara
Representative offices
Dubai · Dammam · Nairobi · Lusaka
Frequently asked questions
For managing directors, plant heads and operations leaders evaluating a manufacturing improvement partner.
What does a manufacturing plant consultant do, and what outcomes can we expect?
Our manufacturing plant consultants work shoulder to shoulder with you and your team on the shop floor to remove waste, balance production lines and clear bottlenecks, so the same plant makes more at a lower cost. Faber Infinite clients typically achieve up to 30% lower manufacturing costs, up to 40% more output and 35% shorter order lead times within three to six months.
Will the work disrupt our daily production targets?
No. Our four-phase roadmap runs on live lines during regular shifts, through incremental adjustments and line balancing. Capacity is freed up as we go, rather than by stopping operations.
Is there a low factory output solution that does not need new machines?
Yes. The most reliable low factory output solution is the capacity you already own. Over 70% of our engagements focus on unlocking hidden capacity from existing machinery and floor space. Through SMED (rapid setup reduction) and TPM (Total Productive Maintenance), we eliminate micro-stoppages and recover 20% to 40% higher throughput before new CapEx is considered.
How is Faber Infinite different from other manufacturing consulting firms in India?
Many manufacturing consulting firms in India deliver a 200-page slide deck and leave. Our senior consultants spend 80% of their time on your factory floor, working shoulder to shoulder with your supervisors, plant engineers and line operators until the improvements are adopted.
How soon will our plant see measurable financial ROI?
Quick operational wins, such as a 15–20% reduction in changeover time and cleared bottlenecks, come within the first six to eight weeks. Full financial payback typically comes within 3–6 months.
How do you make sure improvements are sustained after the project ends?
Sustainability is built into the Sustain phase. We put visual SOPs and daily work management systems in place, and train internal plant champions in lean and productivity methods, so your team keeps and compounds the results on its own.
What is a time and motion study in management, and do you run one?
A time and motion study in management is a structured study of how long each task takes and how people, parts and tools move, so wasted motion and waiting are designed out of the job rather than pushed onto operators. We run time and motion studies as part of line balancing, alongside value stream mapping, SMED, 5S and TPM, chosen to fit your plant’s diagnostic.
How to reduce manufacturing cost in India: where should a plant start?
If you are asking how to reduce manufacturing cost in India, start on the shop floor, not with head-count cuts. Map the value stream, fix the bottleneck, then cut changeover time, downtime and scrap, and release the cash locked in inventory. In that order, cost control and cost reduction come from the process itself. Your free 45-minute plant diagnostic call shows which step matters most for your plant.
Do you also work as a quality and operations management consultant?
Yes. Our quality and operations management consultants work with you and your team, using Lean Six Sigma problem solving and shop-floor coaching to cut defects and reduce scrap rate in manufacturing, then set up the daily review routines that keep operations on target.
Which industries and plant sizes do you work with?
We work across 50+ industries, including automotive, pharmaceuticals, plastics and packaging, heavy engineering, chemicals, textiles and FMCG, from single plants to Fortune 500 groups, in India, Africa and the Middle East.
Speak directly with a senior productivity improvement consultant
Prefer a direct conversation? Connect with our team, or book your free 45-minute plant diagnostic call.
Book your free 45-minute plant diagnostic callCall+91 99099 29830
WhatsAppChat on WhatsApp
Emailconsulting@faberinfinite.com
OfficesOffices in India: Ahmedabad · Pune · Vadodara
Representative offices: Dubai · Dammam · Nairobi · Lusaka